Week - 1 |
Introduction of the materials. |
Week - 2 |
Preparation of the templates. |
Week - 3 |
Preparation of the hand tools. |
Week - 4 |
Making of the bridge. |
Week - 5 |
Making of the tailpiece. |
Week - 6 |
Making of the fingerboard. |
Week - 7 |
Patterning methods. |
Week - 8 |
Pattern preparation for the violin making. |
Week - 9 |
Preparation of the violin mould. |
Week - 10 |
Preparation of the ribs and the side blocks of the mould. |
Week - 11 |
Preparing the joint of the back plates. |
Week - 12 |
Arching of the top plate. |
Week - 13 |
Purfling work. |
Week - 14 |
Graduating of the back and top plates |